ATTENDICO Help Center

Grundlagen und Voraussetzungen des Schichtwechsels

Automatic rotation cycles workers through the shifts of a saved group. Instead of manually assigning a shift on every date, an administrator defines an ordered sequence and a daily or weekly switching rule.

Wozu dient diese Funktion?

This is useful for rotating teams that follow a repeatable schedule. It is different from Manual Planning, which is intended for date-by-date decisions in Planner.

Vorbereitungen

  • Create and save a shift group.
  • Create at least two shifts in that group. The interface blocks enabling rotation without them.
  • Ensure Manual Planning is disabled; the same group cannot use both modes at once.

Optionen und Eingabefelder erklärt

Rotating Group
Master switch for automatic rotation.
By Weeks
Moves to the next shift at a selected weekday after an interval in weeks.
By Days
Moves to the next shift after a specified number of counted days.
Rotation Cycle Start
Optional date reference used to align the cycle.
Shift Rotation Order
Controls the sequence in which saved shifts are used.

Schritt-für-Schritt-Anleitung

  1. Open Shifts and Groups and choose an existing group with at least two shifts.
  2. Make sure Manual Planning is turned off.
  3. Enable Rotating Group.
  4. Select By Weeks or By Days.
  5. Configure the interval and any mode-specific options.
  6. Set Rotation Cycle Start if a particular anchor is needed.
  7. Review Shift Rotation Order and use the arrows to place shifts in sequence.
  8. Save the group and inspect the upcoming dates in Planner.
  9. Assign workers to the group and choose their Current Shift as the starting position.

Was passiert nach dem Speichern?

The group now has automatic rotation settings. Eligible workers follow its shift sequence unless individually configured to Always Keep This Shift.

Wichtige Hinweise und häufige Fehler

  • A group’s rotation day is not the same as a shift’s First Day of Week.
  • Avoid using this mode for non-repeating schedules; Manual Planning is better suited to date-specific assignments.