ATTENDICO Help Center

Kako uporabiti Uporabi za vse in Kopiraj prejšnji dan

In this document you will learn how to use apply to all and copy previous day in Attendico ATS Cloud. The manual planning dialog includes shortcuts for filling many dates. Apply to All applies a chosen option to the visible planning rows, while Copy Previous Day takes the preceding day’s shift choice.

Čemu je namenjena ta možnost?

Use these controls for repeating date-based patterns, but review the resulting dates before saving to avoid overwriting intended days off.

Pred začetkom

  • A group has Manual Planning enabled and contains saved shifts.
  • The relevant employee and date period are loaded in Planner.

Razlaga kontrol

Apply to All
Fills the current manual planning rows with one chosen assignment.
Copy Previous Day
Copies the preceding date’s selected option.
Day Off
A day with no assigned shift.
Manual rows
The individual date-level entries that will be saved.

Navodila po korakih

  1. Open Planner and select the manual-planning group.
  2. Set the date range and select Show.
  3. Choose Plan Rotation to open the manual dialog.
  4. Select the worker.
  5. Choose a shift or Day Off for the first day that you want to configure.
  6. For repeated dates, use Copy Previous Day on the appropriate later rows.
  7. Alternatively choose an assignment and Apply to All when every displayed date should have the same choice.
  8. Review every date carefully, especially weekends and planned days off.
  9. Select Save and reopen the period to verify the actual assignments.

Kaj sledi?

The selected date-level assignments are submitted through the manual scheduling flow.

Pomembne opombe

  • Apply to All is not automatically a custom 2/2 or other named rotation preset; it fills with one selection.